Reaching Renfrewshire - Return to Homepage Reaching Renfrewshire

Renfrewshire Council - Return to Homepage Renfrewshire Council

Contacts |  Using this site |  A to Z of services |  FAQs |  Sitemap | 

* Welcome to Renfrewshire community website *

Home

Services

News and events

About Renfrewshire

Vacancies


Applications for planning permission

Planning appeals and review bodies

ROF Bishopton

Related Content

ROF Bishopton Application 7 - Engineering operations comprising remediation and bulk earthwork (09/0527/PP)

Home > Services > Planning and building standards > Planning applications > ROF Bishopton

Here you can read about and download copies of the planning applications received for the development of the former Royal Ordnance factory at Bishopton.

Many of these documents are very large and may take some time to download, particularly on a dial up modem.

You need Adobe Acrobat Reader to view the documents on this page. Download Acrobat Reader here.

The table below shows the average download times for various sizes of files using broadband and dial up internet access.

File SizeDial-up modem 56Kbps - Estimated download times
hh:mm:ss
Broadband 512Kbps - Estimated download time
hh:mm:ss
100KB00:00:2000:00:07
500KB00:01:4000:00:36
1024KB00:03:2000:01:15
10240KB00:33:2000:12:30

Use the links below to find more information on ROF Bishopton Engineering operations comprising remediation and bulk earth works

Application Reference Number 09/0527/PP - Documents Received
Description of DocumentDocument FormatDate receivedStatus*File size (KB)
Planning Application Formpdf29/07/09Current132KB
Certificate Apdf29/07/09Current544KB
Certificate Bpdf29/07/09Current296KB
Certificate Dpdf29/07/09Current273KB
Certificate 2pdf29/07/09Current437KB
Environmental Impact assessment notificationpdf29/07/09Current102KB
Planning Application boundary planpdf29/07/09Current3.48MB
Neighbour Notification plan - Bishopton Villagepdf29/07/09Current845KB
Neighbour Notification plan - entire sitepdf29/07/09Current1.96MB
Drawing Schedulepdf29/07/09Current38KB
*Some of the documents may become superseded by later versions. The documents are listed in date order and where a document has been superseded this is indicated under the “status” heading.

Back to Links

Application Plans and Drawings

Description of DocumentDocument FormatDate receivedStatus*File size (KB)
General Layoutpdf29/07/09Current3MB
Proposed Restoration Levelspdf29/07/09Current752KB
Bulk Reclamation Earthworkspdf29/07/09Current1.3MB
Surface water drainage layoutpdf29/07/09Current1.1MB
Woodland quality plan development areapdf29/07/09Current1.7MB
Woodland quality plan - development area impact of proposed workspdf29/07/09Current2.4MB
Woodland quality plan - impact of proposed workspdf29/07/09Current4.8MB
Plan of proposed haul roadpdf29/07/09Current2.1MB

Back to Links

Public Consultation Statement

Description of DocumentDocument FormatDate receivedStatus*File size (KB)
Public Consultation Statementpdf29/07/09Current2.4MB


Environmental Statement - non-technical summary

Description of DocumentDocument FormatDate receivedStatus*File size (KB)
Environmental Statement - non-technical summarypdf29/07/09Current1.3MB


Environmental Statement

Description of DocumentDocument FormatDate receivedStatus*File size (KB)
Environmental Statementpdf29/07/09Current18MB

Back to Links

Appendices to the Environmental Statement

Description of DocumentDocument FormatDate receivedStatus*File size (KB)
Environmental Statement Appendices 9.1 to 15.1 (except 11.1 to 11.4)pdf29/07/09Current38MB

Back to Links

Appendix 11.1 Remediation Strategy Report

Description of DocumentDocument FormatDate receivedStatus*File size (KB)
Remediation Strategy Reportpdf29/07/09Current503KB
Landscape Mounds Justification Documentpdf08/02/10Current2.12 MB
Building Decontamination Justification Documentpdf27/02/10Current4.12 MB


Appendix 11.1 Remediation Stategy Report - Figures

Description of DocumentDocument FormatDate receivedStatus*File size (KB)
Figurespdf29/07/09Current6MB

Back to Links

Appendix 11.1 Remediation Strategy Report - Appendices

Description of DocumentDocument FormatDate receivedStatus*File size (KB)
1 Referencespdf29/07/09Current18KB
2 Photographspdf29/07/09Current4.3MB
3 Abbreviations and Acronymspdf29/07/09Current17KB
4 Previous ReportsLink to previous application 06/1119/PP
5 Verification Strategypdf29/07/09Current3.1MB
6 Monitoring Planpdf29/07/09Current5MB
7 Noise and Vibration Planpdf29/07/09Current3.1MB
8 Air Quality Monitoring Programme Final Draftpdf29/07/09Current1.8MB
9 Water Management Strategypdf29/07/09Current1.2MB
10 Generic Site Assessment Criteria - Human Healthpdf29/07/09Current20KB
11 Bishopton Trial Burning Air Quality Summarypdf29/07/09Current236KB


Appendix 11.1 Remediation Strategy Report - Drawings

Description of DocumentDocument FormatDate receivedStatus*File size (KB)
General Layoutpdf29/07/09Current2.2MB
Bulk Reclamation Earthworkspdf29/07/09Current1.3MB
Woodland Quality Plan - Development area impact of proposed workspdf29/07/09Current2.4MB
Woodland Quality Plan - Community Woodland Park impact of proposed workspdf29/07/09Current4.8MB
Contractors Compoundpdf29/07/09Current188KB
Building Decontaminationpdf29/07/09Current2.8MB
Phase 0 Revision Fpdf29/07/09Current3.4MB
Phase 1 Revision Gpdf29/07/09Current3.2MB
Phase 2 Revision Fpdf29/07/09Current2.8MB
Phase 3 Revision Fpdf29/07/09Current2.7MB
Phase 4 Revision Gpdf29/07/09Current2.5MB
Phase 5 Revision Gpdf29/07/09Current2.6MB
Phase 6 Revision Fpdf29/07/09Current2.6MB

Back to Links

Appendix 11.2 Stage 2 Site Investigation Factual Report

Description of DocumentDocument FormatDate receivedStatus*File size (KB)
Stage 2 Site Investigation - Factual Reportpdf29/07/09Current539KB
Stage 2 Site Investigation - Figurespdf29/07/09Current11MB

Back to Links

Appendix 11.2 Stage 2 Site Investigation Factual Report - Appendices

Description of DocumentDocument FormatDate receivedStatus*File size (KB)
1 Referencespdf29/07/09Current17KB
2 Stage 2 Site Investigation Strategy pdf29/07/09Current809KB
3a Hand auger logspdf29/07/09Current5MB
3b Trial pit logspdf29/07/09Current37MB
4 Selected trial pit photographspdf29/07/09Current1.9MB
5a Borehole logspdf29/07/09Current10MB
5b Window sample borehole logspdf29/07/09Current1.3MB
6 Hand dug sample descriptionspdf29/07/09Current38KB
7 Water and Gas monitoring recordspdf29/07/09Current487KB
8 Summary Analytical methodspdf29/07/09Current97KB
Appendices 9a - 9f
Soil Analytical Results - listed below
9a BAE Lab Resultspdf29/07/09Current459KB
9b BAE Certificatespdf29/07/09Current4MB
9c Bodycote Asbestos Membranespdf29/07/09Current1.6MB
9d Bodycote Lab Resultspdf29/07/09Current92 KB
9e Bodycote Certificatespdf29/07/09Current39KB
9f Soil Analytical Resultspdf29/07/09Current51 KB
10 Visual/Olfactory Evidence of Contaminationpdf29/07/09Current14KB
11a Leachability resultspdf29/07/09Current30KB
11b Burning ground certificatespdf29/07/09Current291KB
11c Stage 2 site investigation certificatespdf29/07/09Current8.2MB
12 Duplicate soil resultspdf29/07/09Current133KB
13 Geotechnical resultspdf29/07/09Current8MB
14 Permeability calculationspdf29/07/09Current107KB
Appendices 15a - 15c
Groundwater Analytical Results - listed below
15a BAE Certificatespdf29/07/09Current1MB
15b Groundwater Results Summarypdf29/07/09Current175KB
15c Bodycote Certificatespdf29/07/09Current64MB
16 Duplicate water resultspdf29/07/09Current58KB
Appendices 17a - 17c
Surface Water Analytical Results - listed below
17a BAE Lab Certificatespdf29/07/09Current221KB
17b Surface Water Resultspdf29/07/09Current19KB
17c Bodycote Lab Certificatespdf29/07/09Current3.3MB
18 Summary Gas monitoring datapdf29/07/09Current60KB
19 Acronyms and Abbreviationspdf29/07/09Current29KB

Back to Links

Appendix 11.2 Stage 2 Site Investigation Interpretative Report

Description of DocumentDocument FormatDate receivedStatus*File size (KB)
Interpretative Reportpdf29/07/09Current1.2MB


Appendix 11.2 Stage 2 Site Investigation Interpretative Report - Figures

Description of DocumentDocument FormatDate receivedStatus*File size (KB)
Figures 1-47pdf29/07/09Current31MB

Back to Links


Appendix 11.2 Stage 2 Site Investigation Interpretative Report - Appendices

Description of DocumentDocument FormatDate receivedStatus*File size (KB)
1 Summary of all SOM resultspdf29/07/09Current441KB
2 BAE Systems approach to human health RA pdf29/07/09Current162KB
Appendix 3 Previous BAE Systems Reports and Historical Site Investigation DataLink to previous application 06/1119/PP
4 Water Assessment Criteriapdf29/07/09Current26KB
5a Explosivespdf29/07/09Current439KB
5b Metalspdf29/07/09Current733KB
5c PAHspdf29/07/09Current358KB
5d TPHspdf29/07/09Current103KB
5e BTEXpdf29/07/09Current44KB
5f TPHCWG BTEXpdf29/07/09Current24KB
5g VOCpdf29/07/09Current258KB
5h Perchloratepdf29/07/09Current11KB
5i Solventspdf29/07/09Current40KB
5j Phenolspdf29/07/09Current32KB
5k CN,Sulphatepdf29/07/09Current250KB
5l SVOCpdf29/07/09Current104KB
5m Carbamitepdf29/07/09Current11KB
5n PCBspdf29/07/09Current27KB
5o pH,solids,SOM etcpdf29/07/09Current139KB
5p Asbestospdf29/07/09Current138KB
Appendices 6a - 6b
Additional Hexavalant Chromium Investigation Data - listed below
6a Test Certificate/Resultspdf29/07/09Current157KB
6b TP Logspdf29/07/09Current615KB
Appendices 7a - 7c Supporting Statistics for PAHs Assessment - listed below
7a CDA Residential - PAH statspdf29/07/09Current16KB
7b CDA ROS-PAH statspdf29/07/09Current16KB
7c ROS-PAH statspdf29/07/09Current23KB
8 Summary Gas CDApdf29/07/09Current84 KB
9 Summary Gas ROSpdf29/07/09Current102 KB
10 Summary Gas RLpdf29/07/09Current68KB
Apendices 11a - 11d
Picrite Lagoons Risk Assessments - listed below
11a Figure A - Picrite Lagoons Location Planpdf29/07/09Current181KB
11b Figure B - Location of Historical Boreholespdf29/07/09Current434KB
11c Figure C - Picrite Lagoon Moundpdf29/07/09Current225KB
11d Picrite Lagoons Risk Assessmentpdf29/07/09Current170KB
12 HSE Correspondencepdf29/07/09Current785 KB
13 Leachability summary of analytical resultspdf29/07/09Current70 KB
14 Summary Leachable Fraction Datapdf29/07/09Current13 KB
15 Groundwater summary of analytical resultspdf29/07/09Current719 KB
16 Surfacewater summary of annalytical resultspdf29/07/09Current58 KB
17 Supporting Information to groundwater modelspdf29/07/09Current402KB
18 Acronyms and Abbreviationspdf29/07/09Current29KB



Back to Links

Appendix 11.3 Monitoring Plan

Description of DocumentDocument FormatDate receivedStatus*File size (KB)
Monitoring Plan including Figures and Appendicespdf29/07/09Current4.9MB


Appendix 11.4 Verification Strategy

Description of DocumentDocument FormatDate receivedStatus*File size (KB)
Verification Plan including Figures and Appendicespdf29/07/09Current3.1MB


Consultation Responses
Description of DocumentDocument FormatDate receivedStatus*File size (KB)
Health and Safety Executivepdf17/08/09Current53 KB
West of Scotland Archaeology Servicepdf31/08/09Current204 KB
Forestry Commissionpdf07/09/09Current81 KB
British Airport Authoritypdf07/09/09Current296 KB
Bishopton Community Councilpdf08/09/09Current57 KB
The Scottish Governmentpdf09/09/09Current62 KB
Historic Scotlandpdf15/09/09Current66 KB
Scottish Natural Heritagepdf17/09/09Current923 KB
Scottish Environment Protection Agencypdf22/09/09Current177 KB
Historic Scotlandpdf22/09/09Current71 KB
Scottish Wildlife Trustpdf01/10/09Current94 KB
Transport Scotlandpdf09/10/09Current84 KB
R.S.P.B.pdf13/10/09Current49 KB
Renfrewshire Council Transportation Sectionpdf18/11/09Current55 KB
Renfrewshire Council
Environmental Services
pdf15/03/10Current264 KB

Back to Links

Decision Details
Description of DocumentDocument FormatDate ReceivedStatus*File Size (KB)
Officers ReportpdfN/ACurrent3.79MB
Decision Noticepdf24/03/10Current605KB


Post Decision Submissions
Description of DocumentDocument FormatDate ReceivedStatus*File Size
Asbestos Monitoring Planpdf28/09/2010Current860KB
Land Quality Management Areaspdf23/06/2010Current1MB
Air Quality Monitoring Programmepdf15/12/2010Current4.33MB
Air Quality Monitoring Programme Planpdf15/12/2010Current3.76MB
South Junction Security Access & Parking Areaspdf08/09/2010Current754KB
South Junction Road Markingspdf08/09/2010Current1.24MB
Details of Wheelwash Facilitiespdf08/09/2010Current557KB
Vehicle Routing Agreementpdf15/12/2010Current677KB
Badger Management Planpdf22/10/2010Current1.93MB
Landscape Manual & Bird Managemet Planpdf29/11/2010Current274KB
Location of Temporary Settlement Pondspdf29/11/2010Current705KB
Temporary Settlement Pond 1pdf29/11/2010Current279KB
Temporary Settlement Pond 2pdf29/11/2010Current167KB
Temporary Settlement Ponds 3A & 3Bpdf29/11/2010Current360KB
Temporary Settlement Pond 4pdf29/11/2010Current254KB
Temporary Settlement Pond 5pdf29/11/2010Current173KB
Temporary Settlement Pond 6A & 6Bpdf29/11/2010Current339KB
Temporary Settlement Pond 7pdf29/11/2010Current433KB
Temporary Settlement Ponds 8 & 9pdf29/11/2010Current234KB
Temporary Settlement Pond 10pdf29/11/2010Current277KB
Location of Structural Landscape Areaspdf29/11/2010Current1.45MB
Landscape Proposals - Mound 1pdf29/11/2010Current3.51MB
Landscape Proposals - Mound 2pdf29/11/2010Current3.32MB
Landscape Proposals - Mound 3pdf29/11/2010Current577KB
Landscape Proposals - Borrow Areapdf29/11/2010Current1.66MB
Landscape Proposals - Boghall Meadowpdf29/11/2010Current2.39MB
Landscape Proposals - Central Meadowpdf29/11/2010Current2.30MB
Cross Section through Footpathpdf29/11/2010Current220KB
Stepped Ramp Detailpdf29/11/2010Current293KB
Landscape Restoration Proposalspdf29/11/2010Current2.05MB
Ecological Clerk of Workspdf07/10/2010Current4.57MB
Ecological Design & Management Planpdf14/01/2011Current2.37MB
Archaeological Mitigation Strategypdf12/07/2010Current320KB
Archaeological Evaluation LQMA 04pdf18/10/2010Current7.96MB
Traffic Management Planpdf11/11/2010Current97.77MB
Site Wide Surface Water Management Strategy Rev Cpdf17/01/2011Current2.25MB
Communication Strategypdf07/02/2011Current2.97MB
Sediment Assessment Planpdf09/03/2011Current2.42MB
Noise and Vibration Managment and Monitoring Planpdf16/12/2010Current10.21MB
Site Wide Surface Water Management Strategy Rev Fpdf26/07/2011Superseded4.65MB
Detailed Monitoring Plan for Water Qualitypdf27/07/2011Current2.87MB
Detailed Verification Planpdf27/07/2011Current1.45MB
Framework for Change Planpdf27/07/2011Current3.72MB
Human Health Risk Assessment Criteriapdf30/08/2011Current3.39MB
Building Decontamination Method Statementpdf16/09/2011Current16.24MB
Logistics, Site Clearance and Waste Managementpdf14/09/2011Current12.28MB
Site Wide Surface Water Management Strategy Rev Gpdf29/09/2011Current4.63MB


Back to Links

For further information on this application

How do you rate this information? 1 = good, 2 = average, 3 = poor:



Comments left here are for customer research only. They are not routinely checked and cannot be replied to.

To contact a council service, please use the email links on our contacts page.

Directgov website opening in a new browser window Scottish Government website opening in a new browser window Renfrewshire Council Plain English Campaign content page Renfrewshire Council Fairtrade content page Mod 2013

Accessibility | Privacy policy | Copyright | Disclaimer | Website statistics | Google translate